Light gauge steel framing
Project drawings guide frame production and on-site assembly. Discuss the framing package, fixings and assembly information needed by your team.
The building system
Start with the frame and agree the enclosure, documentation and services required for your project.
Project drawings guide frame production and on-site assembly. Discuss the framing package, fixings and assembly information needed by your team.
Discuss the boards, membranes, insulation, roofing and cladding specified for your project. Cellular concrete is an option for specified applications; it is not assumed to be part of every package.
Confirm the engineering, fabrication, site work, delivery and assembly scope with your project team. Product selection and performance requirements depend on the proposed assembly.
See the project processFollow steel profile production, frame assembly and on-site construction.
Open video directly ↗
An architectural interview and a closer look at the residence complex.
Watch on YouTube ↗
ECOLIT’s published introduction to its cold-formed steel factory.
Watch on YouTube ↗

ECOLIT’s introduction to its international affiliate programme.
Watch on YouTube ↗
An introduction to developing a local ECOLIT production operation.
Watch on YouTube ↗From ECOLIT’s video archive. Regional examples and programme details may differ from your project.
Your next step